Request
Callback

Documents Required For DPCC

Bhupender Nagar Bhupender Nagar | Blog Writter | Updated

Document Required For DPCC Consent/NOC

Following are the document required to obtain DPCC NOC / Consent to Operate / Consent to Establish to be attached along with the DPCC online application form-

 

Documents Required For DPCC White Category

DPCC White category Industry being the least polluting industry requires an undertaking. Following are the document required for DPCC white category -

  • PAN Card
  • Aadhar card
  • Authorization letter
  • Municipal or industry license
  • Factory, trade or health trade license
  • The industry also needs to submit proof of registration of the unit.
  • FSSAI and GST certificate
  • Water Bill
  • Electricity bill
  • The proof of ownership

 

Documents Required For DPCC Green & Orange Category Consent To Establish (CTE)

Following are the document required for DPCC Green, Orange, and Red category-

  • Layout plan
  • Project report discussing in detail about the unit, capital, number of workers, manufacturing procedure, products, etc.
  • PAN Card of the Industrial Unit/Proprietor/HCU
  • Authorization letter not required in case of the individual proprietary.
  • Proof of possession e.g allotment letter or lease deed or valid rental agreement.
  • CA certificate
  • Proof of CETP membership, if applicable
  • Copy of the address proof
  • PAN Card of the Industrial Unit/Proprietor/HCU
  • Authorization letter not required in case of the individual proprietary.
  •  

Document Required For DPCC Green & Orange Category Consent To Operate (CTO)

  • CA certificate
  • Manufacturing procedure
  • Used raw materials, manufactured products, and by-products list
  • Additionally, it requires ETP/STP effluent analysis report
  • Noise monitoring report
  • Proof of CETP membership, if applicable
  • Electricity Bill
  • Water connection copy
  • PAN Card of the Industrial Unit or Proprietor or HCU
  • The original authorization letter
  • It is optional to submit the copy of CGWA or DJB or DC Permission or Registration
  • SSI / MSME Registration Certificate
  • Moreover the applicant has to submit proof of conformity with the master plan of Delhi from concerned authority
  • In the case of the hotel industry, proof of connection of drainage system from the concerned department or a self-attested undertaking. ( hotel industry specifically includes a restaurant, eating house, sweets shops, Dhaba and hotels, banquet halls and party lawns)
  • License from the food safety department in case using tobacco as raw material

What do you think?



Connect With Us

It`s Time to Change Your

Compliance Officer

chnage compliance officer
  • Get 1 months free compliance support
  • 24/7 Expert Advice anytime anywhere
  • 200+ Top CA/CS/Legal Team

User Rating

4.60 average based on 278 reviews.

  • 5 star
    194
  • 4 star
    66
  • 3 star
    14
  • 2 star
    1
  • 1 star
    2

How can we help you?

Stay update with us

Get helpful tips and info from our newsletter!

`