EPR Authorization for BTS All Components Excluding Structure of Tower
EPR Authorization is mandatory for BTS (All Components Excluding Structure of Tower)
Category: EPR Authorization
Product Code: ITEW18
BTS stands for Base Transceiver Station. It is the technical name of the mobile tower we usually see in our cities. This is classified as e-waste under the E-Waste Management Rules of 2022 excluding the tower structure which supports this equipment at high altitudes. It enables the communication between the network and user equipment. If you manufacture this equipment, you need to get EPR Authorisation for BTS (Base Transceiver Station) to sell and distribute these devices in the country. You also need to process the e-waste which will generate because of this equipment over time. It is necessary to follow these compliances to support a circular economy and get a cleaner environment to breathe in.
--------------Blog Contact Form-------------